Most popular

Where is the new pipeline going?

Where is the new pipeline going?

The Keystone XL Pipeline Project (Phase IV) revised proposal in 2012 consists of a new 36-inch (910 mm) pipeline from Hardisty, Alberta, through Montana and South Dakota to Steele City, Nebraska, to “transport of up to 830,000 barrels per day (132,000 m3/d) of crude oil from the Western Canadian Sedimentary Basin in …

What are the current pipeline projects in Canada?

The three key pipelines for Canada are Enbridge Line 3 Replacement Project, Keystone XL and the Trans Mountain Expansion Project.

Why is Line 3 bad?

HUMAN HEALTH AND STRUCTURAL RACISM. Line 3 would disproportionately impact tribal people, threaten resources critical to the survival of tribal communities, and exacerbate the already profound disparities in health access and outcomes that tribal communities face as a result of structural racism.

Where is the gas pipeline expansion in Canada?

The 2021 NGTL system expansion project is a proposed expansion to the existing NGTL natural gas gathering and transportation system located in Alberta and north-eastern British Columbia, Canada.

How are oil and gas pipeline applications reviewed in Alberta?

Canadian Standards Association CSA Z662: Oil and gas pipeline systems We now process new pipeline applications using OneStop, our new automated application review technology. OneStop is a part of our Integrated Decision Approach, which is changing the way we review energy projects in Alberta.

Where is the new NGTL pipeline going to be?

The new 48in-diameter pipeline is planned to be constructed in eight sections in parallel to the existing NGTL pipeline from Grande Prairie to the north of Calgary in Alberta, covering three key areas including the Grande Prairie West Area, the Grande Prairie South Area, and the Edson South Area.

How big are the major projects in Alberta?

An inventory of private and public sector projects in Alberta valued at $5 million or greater. Schedule Sched. The historical summary tab provides snapshots of the Major Projects list on a quarterly basis (before 2015) and on a monthly basis from 2015 onward. 0 results returned.

Share this post